Mobile
Log In Sign Up
Home > chinese-english > "cantilever construction" in English

English translation for "cantilever construction"

悬臂结构
悬臂施工法


Related Translations:
cantilever:  n.1.(桥梁的)悬臂,肱梁;支架。2.电缆吊线夹板;纸条盘。
cantilevered balcony:  挑阳台
hinged cantilever:  旋转腕臂
cantilever hood:  悬臂回转式排风罩悬臂罩
cantilever tank:  肩船
semi cantilever:  半悬臂
cantilever vibration:  悬臂振动悬梁式振动
cantilevered bending:  悬臂弯曲
uniform cantilever:  等截面悬臂
cantilever calibrated:  悬臂校正
Example Sentences:
1.The idea of cantilever construction is ancient in the orient .
在亚洲古代就已实行过悬臂施工。
2.The great new orlean bridge represents modern contemporary long-span steel cantilever construction .
新奥尔良大钢桥表现出了现代大跨径钢桥悬臂施工的技术。
3.Cantilever construction technology of triangle hanging basket
三角挂篮悬臂施工技术
4.Monitoring control for cast - in - place cantilever construction
悬臂浇筑中的施工监测控制
5.Application of displacement back analysis to beam bridge ' s alignment control of cantilever construction
位移反分析在梁桥悬臂施工线形控制计算中应用
6.Precast segmental construction may adopt two methods generally : balanced cantilever construction and span - by - span construction
预制节段拼装施工一般可采用悬臂拼装和逐跨拼装。
7.The basket symmetrical cantilever construction , which is often used , is one way of large - span bridge construction . with the length of cantilever longer , the risk is increased as well
挂篮对称悬臂施工是大跨度桥梁施工中常用的一种方法,随着悬臂长度的加长,风险也随之加大。
8.The bridge has builded by balanced cantilever construction technique . the beam camber of construction is a controlling index of construction quality control . it is nonlinear , and now is not mature forecasting method
该桥采用节段式悬拼施工法,其施工预拱度的控制是关键指标,目前没有一个成熟预测方法。
9.During cantilever construction of large span cable - stayed bridge steel box girder , the local relative deformation of steel box girder is obviously different between girder to be suspended and girder supporting crane
摘要大跨度斜拉桥主梁悬臂拼装匹配过程中,吊机作用梁段和被起吊梁段由于受力不同,相对变形存在较大差异。
10.During the cantilever construction of main girder of a concrete cable - stayed bridge , the main girder at the temporary rigid fixity area of pylon and girder is vulnerable to cracking when the conventional temporary rigid fixity structure is used
摘要在混凝土斜拉桥主梁悬臂施工过程中,采用传统的塔梁临时固结构造存在临时固结处的主梁容易开裂问题。
Similar Words:
"cantilever bridges" English translation, "cantilever brush" English translation, "cantilever brush holder" English translation, "cantilever calibrated" English translation, "cantilever circuit" English translation, "cantilever construction carriage" English translation, "cantilever conveyer" English translation, "cantilever crane" English translation, "cantilever crane, jib crane" English translation, "cantilever cranes" English translation